Coming in Spring 2020, a brand new Data Centre space in Basildon.
Following the success of the ChunkyChips DC Pod 1, Pod 2 is set to launch from early 2020.
A reminder of the Pod 1 Launch Video is below:
Building organically, Pod 2 will commence with 6 new full size 42U racks, with eventual expansion to 24 new cabinets.
- Diverse 1Gb Fibre Links
- N+1 UPS Protection
- 32Amp (A & B) Power to Each Cabinet
- N+1 Emmerson Compression Downflow A/C Units
- 24 Hour Monitored & Recorded CCTV